Commercial Building: Holladay Building Addition (Qwest)

Written by WebAdmin on . Posted in Uncategorized

Building addition that included basement and first floor to make room for additional telephone equipment.

Added an electrical generator to run equipment during a power outage. The project included HVAC for the entire building.

This was a $2m project with an extensive amount planning, design, and build on a tight time schedule.